Not much to take photos of today so I didn't.
Craig spent most of his time on electrical wiring for the new light over the shower, and getting power to the new floor heating. He needed to dedicate a circuit to that, so he was cutting holes out of the garage wall to run wiring from the basement to the bathroom, putting in switches, and he framed out the niche for the shower wall, and filled in some of the crevices in the shower wall with foam. Ripped out the medicine cabinet and sawed some more holes in the floor. He also cut out the drywall where the new light will be installed above the shower, and realized the light we wanted to put there isn't going to work. The light that will work is a special order item that might take a few days to come in. But at least he got all the wiring done and all he has to do is install it once it comes in.
Will take photos by end of day tomorrow. We're really liking our contractor and I told him in two years we'll be calling him to redo the kitchen. First, the wallet will have to recover from this one!
No comments:
Post a Comment